manager@kiaev6.org (915) 212-77133

Kia EV6: High Voltage Shut-off Procedures

Previous pageGuide for Storing, Transporting, and Disposing of Battery System

Used high voltage battery system storage, transportation, disposal guide     • When working on the high voltage system, the work should be performed by technicians who have comp ...

PREV

Next pageHigh Voltage Shut-off Procedures

High Voltage Shut-off Procedures     • When working on high voltage system, the work should be performed by technicians who have completed the relevant training. A lack of under ...

NEXT
Other information:

Kia EV6 (CV) 2022– Workshop Manual: Specification
Specification Item Specification Operating Voltage (V) 9 - 16 Operating Current (A) Max 1.3 Operating condition (°C [°F]) -40 to 115 (-40 to 239) ...

Kia EV6 (CV) 2022– Workshop Manual: Battery System Assembly (BSA)
Component Location 1. Battery Outlet Cooling Hose 2. Battery Inlet Cooling Hose 3. Front High Voltage Junction Box Power Cable 4. Battery Management Unit (BMU) Connector 5. Rear High Voltage Junction Box Power Cable 6. Integrated Charging Control Unit (ICCU) Power Cable 7. Battery Sys ...